Ichthys bet365 golf betting Onshore LNG Facilities - MEC 2 Package

JKC Australia bet365 golf betting Pty Ltd - Darwin NT

ec-large
Mechancial Works Utilities and Offsite - MEC 2 Package

bet365 golf betting Execution Period

February 2014 - June 2018

Contract Value

0 million

Estimated bet365 golf betting Man Hours

3.78 million

bet365 golf betting Description

The Ichthys LNG bet365 golf betting, one of the world’s largest LNG developments, involved gas from the Ichthys Field in the Browse Basin off north-west Australia being exported to the onshore processing facilities in Darwin via a 889km pipeline.

In conjunction with Monadelphous, JKC Australia LNG Pty Ltd (JKC) was responsible for the engineering, procurement and construction of the Ichthys bet365 golf betting Onshore LNG Facilities, including the gas processing plant at Bladin Point.

The MEC-2 package was awarded by JKC, a joint venture between JGC Corporation, Kellogg Brown & Root Pty Ltd and Chiyoda Corporation.

Scope of Work

The scope of work included the erection of piping, mechanical and structural steel for the Utility and Offsite Area of the bet365 golf betting, with the development being the largest ever construction bet365 golf betting in the Northern Territory.

In addition, the MEC2 package included:

  • Unloading module support at the bet365 golf betting’s Module Offloading Facility
  • Module setting and hook-up bet365 golf betting jetty
  • Connection and hook-up bet365 golf betting storage tanks
  • Installation bet365 golf betting plant's utility systems

 

 