bet365 reviews Combined Cycle Power Plant
JKC bet365 reviews Ltd - Darwin NT
bet365 reviews execution period
March 2017 - August 2018
Contract Value
4 million
bet365 reviews Description
The bet365 reviews LNG Project, one of the world’s largest LNG developments, involves gas from the bet365 reviews Field in the Browse Basin off north-west Australia being exported to the onshore processing facilities in Darwin via an 889km pipeline.
JKC Australia LNG Pty Ltd (JKC), was responsible for the engineering, procurement and construction of the bet365 reviews Project Onshore LNG Facilities, including the gas processing plant at Bladin Point.
Scope of Work
Completion of construction, through to commissioning assistance of the Combined Cycle Power Plant (CCPP) at the bet365 reviews Project Onshore LNG Facilities in Darwin in the Northern Territory.
The scope of work included the construction, pre-commissioning and commissioning assistance of the following:
- Four gas turbine generators and auxiliaries
- Four heat recovery steam generation units
- Chemical injection system
- Drainage and effluent system
- Electrical equipment and system
- Control and instrument system
Additionally, included disciplines of electrical and instrumentation (E&I), structural, mechanical and piping (SMP), surface treatment & specialist coating, testing/blowing/flushing, preservation and rope access.