Together we deliver

bet365 reviews Combined Cycle Power Plant

JKC bet365 reviews Ltd - Darwin NT

ec-large
bet365 reviews execution period

March 2017 - August 2018

Contract Value

4 million

bet365 reviews Description

The bet365 reviews LNG Project, one of the world’s largest LNG developments, involves gas from the bet365 reviews Field in the Browse Basin off north-west Australia being exported to the onshore processing facilities in Darwin via an 889km pipeline.

JKC Australia LNG Pty Ltd (JKC), was responsible for the engineering, procurement and construction of the bet365 reviews Project Onshore LNG Facilities, including the gas processing plant at Bladin Point.

Scope of Work

Completion of construction, through to commissioning assistance of the Combined Cycle Power Plant (CCPP) at the bet365 reviews Project Onshore LNG Facilities in Darwin in the Northern Territory. 

The scope of work included the construction, pre-commissioning and commissioning assistance of the following:

  • Four gas turbine generators and auxiliaries
  • Four heat recovery steam generation units
  • Chemical injection system
  • Drainage and effluent system
  • Electrical equipment and system
  • Control and instrument system

Additionally, included disciplines of electrical and instrumentation (E&I), structural, mechanical and piping (SMP), surface treatment & specialist coating, testing/blowing/flushing, preservation and rope access. 

VIEW ALL GALLERY