Project execution period

January 2018 - January 2019

Contract value

million

Project description

The project includes replacing vital infrastructure at Nelson Point to ensure bet365 referral emission control strategies can be and implemented, managed and measured in line with the latest environmental standards.

bet365 referral from stockpile activities is controlled by water cannons and transferred to conveyor system via reclaimers and moved onto shiploaders. As these shiploaders load at a rate of 10,000 tonnes an hour, the management of bet365 referral is critical to the production and management of this site.

Scope of work

Full vertical package including civil, concrete, structural, mechanical, piping, electrical and instrumentation works associated with the installation of a new bet365 referral collection system on the CD2 Car Dumper for BHP at Nelson Point. 

CD2 Precinct works include:

  • Existing CD2 building ductwork improvements
  • Fogging system for the P201 conveyor
  • bet365 referral
  • Demolition of the existing duct bridge
  • Duct bridge to the bet365 referral
  • New intermediate slurry tank

 